Chalet Creek Project Update

On September 29th, Kate and Sarah, volunteers from Stantec Environmental Consultants, carried out a survey on the pond and measured depths and dissolved oxygen content. This is preparatory work for the plan to augment the summer flow of water from the pond to Chalet Creek in the summertime. Test holes in the area of a proposed berm were also dug to determine soil conditions.